Sample SSSP
This is a full Site-Specific Safety Plan for a New Zealand builder, so you can see the structure before you order. It covers the project details, hazard register, task analyses, emergency plan, overlapping duties, reporting and sign-off, all built on HSWA 2015.
Preview (first sections)
# Site-Specific Safety Plan (SSSP) - PCBU / Company: Kauri Build Ltd - Contact Person: Hemi Walker (021 000 000) - Main Contractor: (main contractor for the project) - Site Address: 18 Parton Road, Papamoa, Tauranga - Project Name: Papamoa Townhouses Stage 2 - Trade: Builder - Date Prepared: (date this plan is prepared) - Review Date: Review whenever the work, the hazards or the controls change, and at least monthly ## Project & Site Details Kauri Build Ltd is engaged to carry out framing, roofing and exterior cladding for six townhouses at 18 Parton Road, Papamoa. This plan sets out how Kauri Build Ltd manages the health and safety risks of its work on this site, and how it works in with the main contractor and the other PCBUs on site. ## PCBU, Roles & Responsibilities As the PCBU, Kauri Build Ltd holds the primary duty of care under section 36 of the Health and Safety at Work Act 2015 to ensure, so far as is reasonably practicable, the health and safety of its workers and anyone affected by the work. The site supervisor is responsible for implementing this plan, briefing the crew and stopping work if a control cannot be maintained. ## Health & Safety Commitment Kauri Build Ltd is committed to eliminating risks so far as is reasonably practicable and, where that is not possible, minimising them using the hierarchy of control measures. Workers are encouraged to raise hazards at any time. ## Hazard & Risk Register ### Working at height (framing and roofing) - Hazards: falls from height during framing, roofing and upper-floor work - Controls (reg 6 order): eliminate work at height where possible by pre-assembly at ground level; provide edge protection and a full scaffold before roof work; use a total restraint system where edge protection is not practicable; fall arrest only as a last resort - Residual risk: Low - Responsible: Site supervisor ### Manual handling - Hazards: strains from lifting frames, beams and sheet material - Controls (reg 6 order): use mechanical aids and team lifts; break loads down; rotate tasks - Residual risk: Low - Responsible: Site supervisor ### Silica and wood dust - Hazards: respirable dust from cutting fibre cement and timber - Controls (reg 6 order): cut outside where possible; use on-tool extraction or wet cutting; RPE as the final layer - Residual risk: Low - Responsible: Leading hand ## Task Analyses ### Roof framing and truss installation - Steps: set out, crane or lift trusses into position, brace, fix - Hazards and controls: falls (edge protection and platforms in place before work starts); crush from swinging loads (exclusion zone, tag lines); tool injuries (guards, trained operators) ### Exterior cladding above ground level - Steps: load out, fix cladding from scaffold, seal - Hazards and controls: falls (full scaffold with guardrails); dust (on-tool extraction); manual handling (team lift long sheets)
The full sample continues with the emergency plan, inductions, subcontractor management, reporting, worker engagement, the review schedule and the sign-off blocks.
Get a site-specific SSSP the main contractor will accept
Answer a few questions about your site and crew. We write your SSSP against HSWA 2015 and the General Risk and Workplace Management Regulations 2016, check it, and email it, ready to hand over.
SSSP Pack
NZ$89 one-time
A personalised SSSP with your hazard register, task analyses and emergency plan.
Trade Pack
NZ$149 one-time
The SSSP plus the full task-analysis library for your trade and a toolbox talk set.
One-time payment in NZ$. No subscription. Free revisions within 24 hours.
Common questions
Can I see a full SSSP before I buy?
Yes. The preview on this page shows the structure and a real builder example. Enter your email for the full sample SSSP as a PDF, so you can see exactly what you get before you order one for your own site.
Is the sample specific to my trade?
The sample is for a builder, to show the format. When you order, we generate a plan around your trade, site, crew and hazards, so your SSSP is specific to your job, not this example.