Roofer SWMS in New South Wales
In New South Wales, roofer contractors must prepare a Safe Work Method Statement before starting high risk construction work, under WHS Regulation 2025 (NSW) s 299, which requires a SWMS before any high risk construction work. The regulator is SafeWork NSW. For roofer work the SWMS must be site-specific and cover the high risk categories the trade routinely hits: risk of a person falling more than 2 metres, work on or near energised electrical installations or services. One SWMS can cover several of those activities. A generic template can be reused for recurring work only if it is reviewed and adapted to each site's hazards first; an unreviewed copy does not meet the requirement.
The SWMS law in New South Wales
Roofer work in New South Wales is regulated by SafeWork NSW under the Work Health and Safety Act 2011 (NSW) and the Work Health and Safety Regulation 2025 (NSW). The duty to prepare a SWMS before high risk construction work is set by WHS Regulation 2025 (NSW) s 299, and the high risk construction work itself is defined in WHS Regulation 2025 (NSW) s 291. These follow the harmonised model WHS laws, so a SWMS prepared for another harmonised state transfers with a site-specific review.
NSW remade its regulations as the WHS Regulation 2025, which commenced on 22 August 2025 and replaced the WHS Regulation 2017, so the current SWMS duties are cited as sections (s 299, s 291) rather than clauses.
Industrial manslaughter is an offence under the WHS Act 2011 (NSW) since 2024, carrying the most serious criminal penalties in NSW work health and safety law for a PCBU or officer whose conduct causes a worker's death. A site-specific SWMS is part of how a roofer business shows it identified and controlled the high risk work these duties attach to, rather than relying on a generic template.
High risk work for roofer crews
The high risk construction work categories a roofer SWMS usually has to cover:
- ✓ Risk of a person falling more than 2 metres
- ✓ Work on or near energised electrical installations or services
Typical roofer activities that each need their own SWMS:
- · Metal roof installation and replacement above 2 m
- · Tile roof repairs and re-bedding
- · Roof sheeting removal and disposal
- · Gutter and downpipe replacement at height
- · Fall protection setup: edge protection, static lines, harness work
- · EWP use for roof access
Hazards a roofer SWMS has to control
The hazards that recur on roofer jobs and that a site-specific SWMS is expected to address:
- ⚠ Falls from roof edges and through fragile surfaces
- ⚠ Falling objects onto persons below
- ⚠ Overhead powerlines
- ⚠ Heat exposure on exposed roofs
- ⚠ Manual handling of sheets and tiles
The rules a roofer SWMS is written against
Beyond the general duty in WHS Regulation 2025 (NSW) s 299, a roofer SWMS in New South Wales is written against the specific model WHS duties and standards that apply to the trade's activities:
- § reg 78 and reg 79: manage the risk of ANY fall liable to cause injury on a roof; a fall of more than 2 m is additionally high risk construction work under reg 291
- § AS/NZS 1891: industrial fall-arrest systems and devices
- § AS 1657: fixed platforms, walkways and ladders
- § reg 166: when working near overhead electric lines, no person, plant or thing may come within an unsafe distance of the line; where that is not reasonably practicable a risk assessment and control measures are required
- § reg 44 to reg 47: PPE duties
What New South Wales builders check before you start
A principal contractor in New South Wales collects your SWMS before your crew goes on site and checks four things: that it is site-specific to this job (not a reused template), that every high risk category for roofer work is covered and controlled, that controls follow the hierarchy rather than jumping to PPE, and that it cites New South Wales legislation. SWMS Pack writes to all four: your site details throughout, WHS Regulation 2025 (NSW) s 299 cited, and an adversarial review pass before delivery.
Common questions
▸Do roofer contractors need a SWMS in New South Wales?
Yes, whenever the work involves any high risk construction work, which for roofer work it usually does (risk of a person falling more than 2 metres and work on or near energised electrical installations or services). The duty to prepare it sits with the PCBU carrying out the work, under WHS Regulation 2025 (NSW) s 299.
▸Which law covers SWMS in New South Wales?
The Work Health and Safety Act 2011 (NSW) and the Work Health and Safety Regulation 2025 (NSW), enforced by SafeWork NSW. These follow the harmonised model WHS laws used in most states.
▸How fast can I get a roofer SWMS for a New South Wales site?
About 5 minutes of questions, then the document is generated and verified in a few minutes and downloads straight away, written to New South Wales legislation and to your specific site.
Writing it yourself? Start from the SWMS template NSW guide for the New South Wales rules.
Roofer SWMS in other states
VictoriaQueenslandWestern AustraliaSouth AustraliaTasmaniaAustralian Capital TerritoryNorthern Territory
Other trades in New South Wales
ElectricianPlumberCarpenterScaffolderConcreterBricklayerPainterTilerDemolitionExcavation / EarthmovingSolar Installer