Roofing SWMS for Roofer Contractors
The site-specific SWMS builders demand before your crew can start. Generated for roofer contractors in about 4 minutes, checked against our library of current state WHS citations, A$39 flat.
Trade packs from A$179 · toolbox talk pack (24 talks) +A$24 at checkout

When you need this document
A builder or principal contractor is asking for a site-specific SWMS before you can get on the job, or your work falls under a high risk construction work category and the law requires one before work starts.
What it covers for roofer work
Typical hazards addressed: falls from roof edges and through fragile surfaces, falling objects onto persons below, overhead powerlines, heat exposure on exposed roofs, manual handling of sheets and tiles. Citations from the Roofer focus list:
- §reg 78 and reg 79: manage the risk of ANY fall liable to cause injury on a roof; a fall of more than 2 m is additionally high risk construction work under reg 291
- §AS/NZS 1891: industrial fall-arrest systems and devices
- §AS 1657: fixed platforms, walkways and ladders
- §reg 166: when working near overhead electric lines, no person, plant or thing may come within an unsafe distance of the line; where that is not reasonably practicable a risk assessment and control measures are required
- §reg 44 to reg 47: PPE duties
What's inside
- ✓ Title block: PCBU, principal contractor, site address, prepared and review dates
- ✓ High risk construction work categories identified for your activity
- ✓ Step-by-step work method with hazards, risk ratings, and controls
- ✓ Controls in hierarchy order: eliminate, substitute, isolate, engineer, administer, PPE
- ✓ Plant, equipment, permits, licences, and training requirements
- ✓ Emergency procedures and review triggers
- ✓ Your state’s legislation cited (WHS Regulation, or OHS Regulations in Victoria)
- ✓ Worker consultation and sign-off block
What a safe work method statement costs everywhere else
Same document, three very different price tags and wait times.
| Safety consultant | Template shops | SWMS Pack | |
|---|---|---|---|
| Price | A$250 to A$1500 | A$19 to A$88 per template | A$39, packs from A$179 |
| Turnaround | 3 to 10 days | hours of DIY editing | ~4 minutes |
| Site-specific to this job | Yes | No, you fill in blanks | Yes |
| State-correct citations | Yes | Often generic or stale | Yes, verified against 80+ WHS citations |
| Victoria handled correctly | Yes | Rarely | Yes, OHS Regulations branch |
| Revisions when the builder asks | Billed hourly | You edit it yourself | Free within 24h |
Common questions
▸How fast can I get a safe work method statement?
About 4 minutes after the 10-minute questionnaire. It downloads instantly and a copy lands in your email.
▸Does it cover the WHS requirements for roofer work?
Yes. Roofer documents are generated against a curated WHS focus list for the trade, and every regulation and Australian Standard citation is validated against a verified citations table before delivery. Victorian orders are written to the OHS Regulations 2017 instead.
▸What if the builder or principal contractor asks for changes?
Reply to your delivery email and we revise the document free within 24 hours.
Roofer SWMS by state
Your SWMS is written to your state's legislation. Victoria uses its own OHS Regulations; the other states and territories follow the harmonised WHS laws.
Roofer SWMS NSWRoofer SWMS VICRoofer SWMS QLDRoofer SWMS WARoofer SWMS SARoofer SWMS TASRoofer SWMS ACTRoofer SWMS NT
Safe Work Method Statement for other trades
ElectricianPlumberCarpenterScaffolderConcreterBricklayerPainterTilerDemolitionExcavation / EarthmovingSolar Installer
Free tools and guides
Free SWMS template (PDF + Word)Working at heights SWMSExcavation SWMSConfined space entry permitSWMS vs JSA: the differenceSWMS requirements by stateThe 18 HRCW categoriesAll WHS documents for roofersSWMS cost calculator