Emergency evacuation plan template
This free emergency evacuation plan template builds a site emergency plan you can print and pin up. Under regulation 43 of the WHS Regulations, every workplace needs an emergency plan that covers how to respond, evacuate, call 000, get medical help and talk to everyone on site, plus how the plan is tested and taught. Fill in the boxes and the tool shows which parts are still missing.
1. The site
Pick the state or territory so the plan names the right law.
2. Emergency contacts
Police, fire and ambulance: 000. Poisons Information Centre: 13 11 26. Both print on the plan.
3. What could happen and how people are warned
4. Evacuation
5. Medical help
6. Testing, training and review
0 of 7 parts covered
- โ An effective response to an emergency (reg 43(1)(a)(i))Tick the emergencies the site could have and say how the alarm is raised.
- โ Evacuation procedures (reg 43(1)(a)(ii))Add the exit routes and the assembly point.
- โ Notifying emergency services at the earliest opportunity (reg 43(1)(a)(iii))Name the person who calls 000 (the emergency coordinator).
- โ Medical treatment and assistance (reg 43(1)(a)(iv))Add the first aider and the first aid kit location or nearest medical centre.
- โ Communication between the coordinator and everyone on site (reg 43(1)(a)(v))Say how the coordinator talks to everyone on site (radio, phone, air horn, wardens).
- โ Testing the procedures, and how often (reg 43(1)(b))Say how the plan is tested and how often.
- โ Information, training and instruction for workers (reg 43(1)(c))Say how workers learn the plan (induction, toolbox talk, drill).
Also: Pick the state or territory. Add the business name. Add the site address. Set a review date.
What an emergency plan must cover (WHS reg 43)
The parts below are the words of regulation 43(1) in plain English. Each one is a section of the printed plan.
| Reg 43 | The plan must provide for | What to write for your site |
|---|---|---|
| 43(1)(a)(i) | An effective response to an emergency | The emergencies your site could have (fire, medical, chemical spill, storm) and how the alarm is raised. |
| 43(1)(a)(ii) | Evacuation procedures | Exit routes, the assembly point, warden roles, help for people who cannot get out alone, and how everyone is counted. |
| 43(1)(a)(iii) | Notifying emergency services at the earliest opportunity | Who calls 000 and the address they give. |
| 43(1)(a)(iv) | Medical treatment and assistance | The first aider, where the first aid kit is, and the nearest hospital or medical centre. |
| 43(1)(a)(v) | Communication between the coordinator and everyone at the workplace | How the person running the response reaches every person on site: radio, phone, wardens. |
| 43(1)(b) | Testing of the emergency procedures, including how often | The drill or test you run and how often you run it. |
| 43(1)(c) | Information, training and instruction for workers | How workers learn the plan: induction, toolbox talks, warden briefings. |
Regulation 43 also says you must keep the plan up to date so it stays effective (43(2)), think about the type of work, the hazards, the size and location of the site and who is there (43(3)), and use the plan when an emergency happens (43(4)).
Emergency plan template for construction sites
A building site changes every week, so a generic office plan does not fit. The exit route on Monday can be blocked by a scaffold on Friday, and the crew changes as each trade arrives. Keep the plan short, write it for the stage the job is at, and walk every new worker through it at the site induction. Use the sign-on sheet to count people at the assembly point.
Safe Work Australia lists the emergencies to plan for: fire, explosion, medical emergency, rescues, hazardous chemical incidents, bomb threats, armed confrontations and natural disasters. It also says to think about hazards outside the site, such as a chemical store across the road. Higher risk work may need more in the plan. Safe Work Australia gives examples such as confined spaces, fall arrest harness systems, asbestos and hazardous chemicals. The rescue steps for that work also belong in the SWMS for the job.
How it works
The emergency evacuation plan template follows the order of regulation 43. As you fill in each box, the checklist under the form ticks off the part of the regulation it covers, and lists what is still missing. Pick your state first: the printed plan names the WHS Regulations, or for Victoria, the OHS Act 2004 and OHS Regulations 2017.
You choose how often the plan is tested, because the law leaves that to you. If you add the date of the last drill, the tool works out when the next one is due. Press print to get the plan on its own, ready to sign and display. Any box you leave empty prints as a line to fill in by hand. The form does not save or send anything you type.
The plan should also say where the first aid kit is. Check the kit contents with the first aid kit checklist, and match fire gear to the hazards with the fire extinguisher types chart.
Common questions
โธIs an emergency evacuation plan a legal requirement in Australia?
Yes, in every state and territory that uses the model WHS laws. Regulation 43 of the WHS Regulations says a person conducting a business or undertaking must make sure an emergency plan is prepared for the workplace, keep it up to date so it stays effective, and put it into action in an emergency. Victoria has its own OHS Act 2004 and OHS Regulations 2017, so regulation 43 does not apply there; check WorkSafe Victoria guidance.
โธWhat should an emergency evacuation plan include?
Regulation 43 lists the parts: emergency procedures (an effective response, evacuation, calling emergency services early, medical treatment and help, and communication between the coordinator and everyone on site), testing of those procedures including how often, and information, training and instruction for workers. Safe Work Australia adds practical items such as warden and first aider contacts, how the alarm is raised, help for people with hearing, vision or mobility needs, and a site map showing exits and assembly points.
โธHow often should an emergency evacuation plan be tested?
The WHS Regulations do not set a number. They say the plan must provide for testing of the emergency procedures, including the frequency of testing, so you decide how often and write it in the plan. Base it on the hazards and how often the crew changes, and test again after any big change to the site.
โธWho needs an emergency plan on a construction site?
Every business working there has the duty. Safe Work Australia says that on a shared workplace such as a construction site, the businesses must consult, cooperate and coordinate, and a master emergency plan can be prepared that all of them use. In practice the principal contractor usually runs the site plan, and each subcontractor makes sure its own crew knows it.
โธWhen should an emergency plan be reviewed?
Safe Work Australia gives four examples: when the workplace changes (a move or a refurbishment), when the number or mix of workers changes, when new activities start, and after the plan has been tested. On a building site that means at each new stage of the job, not just once a year.
โธWhere should the emergency plan be kept?
Somewhere workers can see it. Safe Work Australia says the plan, or a summary of its key parts, should be easy for workers to get to or on display, for example on a notice board. On site, that is usually the site shed or the sign-in point, and it is covered at induction.
Sources
- Model Work Health and Safety Regulations 2011, regulation 43 (Federal Register of Legislation)
- Work Health and Safety Regulation 2011 (Qld), section 43 (same wording as the model regulation)
- Safe Work Australia, Emergency plans fact sheet (page updated 8 October 2021)
- Safe Work Australia, Emergency plan template (16 August 2021)
- healthdirect, Poisoning (Poisons Information Centre 13 11 26)
The emergency plan covers the site. A SWMS covers the risky work.
High risk construction work needs a SWMS before it starts, with its own emergency and rescue steps where the work calls for them. Check the job with the SWMS checker, or build one now.
Build a SWMS for A$39More free tools
โ Do I need a SWMS?
Pick your state and job, find out if a SWMS is legally required.
๐ก๏ธ SWMS compliance self-check
Score your SWMS against what a principal contractor checks before you send it.
๐ฐ SWMS cost calculator
Compare the true cost of a SWMS: your own time, a consultant, or a generator.
๐ JSA builder
Build a printable Job Safety Analysis: steps, hazards, risk ratings, controls.
๐ข Risk matrix calculator
Score a hazard on the 5ร5 matrix: likelihood ร consequence.
๐ชช High risk work licence checker
Find out which high risk work licence a task needs.
๐ง Site induction checklist
Generate a printable site induction checklist for new workers.
๐ Incident report form
Generate a printable incident and injury report form for your site.
๐จ Is this incident notifiable?
Check if a workplace incident must be reported to the regulator, and who to tell.
๐๏ธ Toolbox talk sign-on sheet
Printable attendance sheet so your toolbox talk is documented.
๐ LTIFR and TRIFR calculator
Work out your lost time and total recordable injury frequency rates per million hours.
โ Take 5 card
Fill in a Take 5 before the task, then print it or save it as a PDF.
๐งฏ Fire extinguisher types selector
Pick the fire class or hazard, see which extinguisher types suit it and their colour band.
๐ Test and tag interval finder
How often to test and tag tools, leads and RCDs in your state and work area, and when the next test is due.
๐ Pre-start checklist builder
Fill in a forklift, vehicle or plant pre-start on your phone, flag faults, then print or save it.
๐ฅ Hot work permit
Fill in a hot work permit for welding, cutting or grinding, with fire watch times, then print it.
โ๏ธ First aid kit checklist
Get the Safe Work Australia kit contents for your workplace, see how many first aiders you need, tick it off and print.
Guides
What is a SWMS?How to write a SWMSHierarchy of controlsThe 18 HRCW categoriesAll guides
Need the real document, not just a tool?
A site-specific SWMS for your trade, verified and delivered in minutes. A$39, or A$179 for every SWMS your trade needs.
Build my SWMS for A$39