Tiler SWMS in Western Australia
In Western Australia, tiler contractors must prepare a Safe Work Method Statement before starting high risk construction work, under WHS (General) Regulations 2022 (WA) reg 299, which requires a SWMS before any high risk construction work. The regulator is WorkSafe WA. For tiler work the SWMS must be site-specific and cover the high risk categories the trade routinely hits: risk of a person falling more than 2 metres. One SWMS can cover several of those activities. A generic template can be reused for recurring work only if it is reviewed and adapted to each site's hazards first; an unreviewed copy does not meet the requirement.
The SWMS law in Western Australia
Tiler work in Western Australia is regulated by WorkSafe WA under the Work Health and Safety Act 2020 (WA) and the Work Health and Safety (General) Regulations 2022 (WA). The duty to prepare a SWMS before high risk construction work is set by WHS (General) Regulations 2022 (WA) reg 299, and the high risk construction work itself is defined in WHS (General) Regulations 2022 (WA) reg 291. These follow the harmonised model WHS laws, so a SWMS prepared for another harmonised state transfers with a site-specific review.
WA was the last jurisdiction to adopt the harmonised model WHS laws (31 March 2022), so its construction case law is still developing; its WHS (General) Regulations 2022 sit alongside separate mining and petroleum safety regulations.
Industrial manslaughter has applied in Western Australia since the WHS Act 2020 (WA) commenced on 31 March 2022, replacing the former Occupational Safety and Health Act 1984. A site-specific SWMS is part of how a tiler business shows it identified and controlled the high risk work these duties attach to, rather than relying on a generic template.
High risk work for tiler crews
The high risk construction work categories a tiler SWMS usually has to cover:
- ✓ Risk of a person falling more than 2 metres
Typical tiler activities that each need their own SWMS:
- · Tile cutting and grinding with silica dust controls
- · Bathroom and wet area tiling with waterproofing membranes
- · Balcony and external tiling above 2 m
- · Floor grinding and surface preparation
- · Stairwell and void-edge tiling
- · Large format tile handling and installation
Hazards a tiler SWMS has to control
The hazards that recur on tiler jobs and that a site-specific SWMS is expected to address:
- ⚠ Silica dust from tile cutting and grinding
- ⚠ Falls from balconies and stair voids
- ⚠ Adhesive and epoxy exposure
- ⚠ Knee and back strain
- ⚠ Wet area slips
The rules a tiler SWMS is written against
Beyond the general duty in WHS (General) Regulations 2022 (WA) reg 299, a tiler SWMS in Western Australia is written against the specific model WHS duties and standards that apply to the trade's activities:
- § reg 36: hierarchy of controls for silica dust when cutting tiles (wet cutting first)
- § reg 78 and reg 79: falls when tiling balconies, facades and stairwells
- § reg 44 to reg 47: PPE duties (RPE, knee protection, eye protection)
- § reg 447: the asbestos duties for demolition and refurbishment (reg 448 to reg 457) apply to the demolition or refurbishment of a structure or plant constructed or installed before 31 December 2003. Demolition or refurbishment does not include minor or routine maintenance work, or other minor work. Where these duties apply they are law, never good practice
- § reg 448 to reg 450: before demolition or refurbishment starts, the person with management or control of the workplace must ensure the asbestos register is reviewed (and revised if it is inadequate for the proposed work) and that the business carrying out the work is given a copy, and the business carrying out the demolition or refurbishment must obtain a copy of the asbestos register from the person with management or control of the workplace before it starts the work
- § reg 451: where there is no asbestos register for the structure or plant, the business that is to carry out the demolition or refurbishment must not carry it out until the structure or plant has been inspected to determine whether asbestos or ACM is fixed to or installed in it, and must ensure that the determination is undertaken by a competent person. It must assume that asbestos or ACM is fixed to or installed in the structure or plant if the competent person is, on reasonable grounds, uncertain, or if part of the structure or plant is inaccessible and likely to be disturbed. If asbestos or ACM is determined or assumed to be present, it must inform the occupier and the owner of the premises (residential premises) or, in any other case, the person with management or control of the workplace
- § reg 456 and reg 457: all asbestos that is likely to be disturbed by the refurbishment must be identified and, so far as is reasonably practicable, removed before the refurbishment is commenced. For residential premises this is the duty of the business carrying out the refurbishment (reg 457); for any other workplace it is the duty of the person with management or control of the workplace, or of the structure or plant (reg 456)
What Western Australia builders check before you start
A principal contractor in Western Australia collects your SWMS before your crew goes on site and checks four things: that it is site-specific to this job (not a reused template), that every high risk category for tiler work is covered and controlled, that controls follow the hierarchy rather than jumping to PPE, and that it cites Western Australia legislation. SWMS Pack writes to all four: your site details throughout, WHS (General) Regulations 2022 (WA) reg 299 cited, and an adversarial review pass before delivery.
Common questions
▸Do tiler contractors need a SWMS in Western Australia?
Yes, whenever the work involves any high risk construction work, which for tiler work it usually does (risk of a person falling more than 2 metres). The duty to prepare it sits with the PCBU carrying out the work, under WHS (General) Regulations 2022 (WA) reg 299.
▸Which law covers SWMS in Western Australia?
The Work Health and Safety Act 2020 (WA) and the Work Health and Safety (General) Regulations 2022 (WA), enforced by WorkSafe WA. These follow the harmonised model WHS laws used in most states.
▸How fast can I get a tiler SWMS for a Western Australia site?
About 5 minutes of questions, then the document is generated and verified in a few minutes and downloads straight away, written to Western Australia legislation and to your specific site.
Writing it yourself? Start from the SWMS template WA guide for the Western Australia rules.
Tiler SWMS in other states
New South WalesVictoriaQueenslandSouth AustraliaTasmaniaAustralian Capital TerritoryNorthern Territory
Other trades in Western Australia
ElectricianPlumberCarpenterRooferScaffolderConcreterBricklayerPainterDemolitionExcavation / EarthmovingSolar Installer