SPSWMS Pack

Vehicle inspection checklist

A quick vehicle check catches the bald tyre, the blown light, and the unrestrained load before they become an incident or a fine. Use this checklist for utes, vans and light vehicles used for site work: walk around, tick, record defects, and get them fixed.

Vehicle inspection checklist

Company: ____________

Site: ____________

Date: ____________

Walk-around

Tyres: tread, pressure, no damage (including spare)N/A · Action
Lights and indicators all workingN/A · Action
Windscreen and mirrors clean, no cracks in driver visionN/A · Action
Body damage notedN/A · Action
Registration currentN/A · Action

In cab

Brakes and handbrake feel correctN/A · Action
Seatbelts intact and workingN/A · Action
Horn worksN/A · Action
Warning lights: none showing after startN/A · Action
First aid kit stocked and in dateN/A · Action
Fire extinguisher present, in date, securedN/A · Action

Load and equipment

Load restrained (straps, cargo net, cage) and within limitsN/A · Action
Ladders and long loads flagged and securedN/A · Action
Gas bottles upright and securedN/A · Action
Tools and materials not loose in the cabN/A · Action

Defects

Defects found and reported to: ____________N/A · Action
Vehicle safe to use: YES / NON/A · Action
Defect fixed on (date): ____________N/A · Action

Completed by: ____________________

Signature: ____________________

swmspack.com · Free printable checklist. Not legal advice; adapt to your site.

Common questions

How often should site vehicles be checked?

A quick pre-drive walk-around daily or before first use, and a fuller documented check weekly or per your company procedure. The point is a routine that actually happens, recorded.

Is a vehicle checklist legally required?

Vehicles used for work are plant, and the duty to maintain safe plant applies to them like anything else. The checklist is the practical, recordable way to show the vehicle was checked.

Vehicles are plant. If your work involves plant-heavy tasks, your SWMS should say how they are controlled.

A checklist confirms controls are in place; a SWMS is the document the law requires before high risk construction work starts. Generate a site-specific one for your trade.

More free checklists

All checklists → · Free tools · Guides