Work Near Movement of Powered Mobile Plant

Generate a SWMS for this work (A$39)Free SWMS template

Site-specific, delivered in about 4 minutes ยท free revision within 24h

Work in an area with movement of powered mobile plant, excavators, forklifts, cranes, telehandlers, is high risk construction work needing a SWMS because of the risk of being struck or crushed.

Why this is high risk construction work

Plant operators have blind spots and workers on foot are easily missed, so struck-by and crush incidents are common and severe. Separating people from plant is the priority.

Because it is one of the 18 high risk construction work categories, a SWMS is legally required before the work starts (your state's WHS Regulations, provision 299; s 299 in NSW), not a nice-to-have.

The controls a SWMS should set out

In hierarchy of controls order, highest first:

Trades that do this work

These trades commonly need a SWMS for this category. Each has a trade-specific SWMS:

Excavation / Earthmoving SWMSConcreter SWMSDemolition SWMS

Get a SWMS for this work in minutes

Answer a few questions and the generator writes a site-specific SWMS covering this high risk work, checked against our library of current state WHS citations, for A$39.

Start the questionnaire

Other high risk construction work

with a Risk of Falling More Than 2 Metreson a Telecommunication TowerDemolition of a Load-Bearing StructureLikely to Disturb AsbestosStructural Alterations Requiring Temporary SupportIn or Near a Confined SpaceAll 18 categories