Excavation SWMS for Excavation / Earthmoving Contractors

The site-specific SWMS builders demand before your crew can start. Generated for excavation / earthmoving contractors in about 4 minutes, checked against our library of current state WHS citations, A$39 flat.

Trade packs from A$179 · toolbox talk pack (24 talks) +A$24 at checkout

Page 1 of a sample SWMS: switchboard installation for an electrical contractor in NSW
Page 1 of a sample SWMS. See the full sample

When you need this document

A builder or principal contractor is asking for a site-specific SWMS before you can get on the job, or your work falls under a high risk construction work category and the law requires one before work starts.

What it covers for excavation / earthmoving work

Typical hazards addressed: trench and excavation collapse, underground service strikes, overhead powerlines, powered mobile plant near workers on foot, traffic on adjacent roads, water ingress. Citations from the Excavation / Earthmoving focus list:

  • §reg 306: before excavating a trench at least 1.5 m deep, secure the work area from unauthorised access and support all sides by shoring, benching or battering, unless a geotechnical engineer advises in writing that the sides are safe from collapse. The duty applies to a trench 1.5 m deep or deeper. It sets no inspection frequency, so trench inspection is written as good practice without this citation. Securing the area around a shallower excavation is NOT this duty (see reg 305)
  • §reg 291: high risk construction work includes work in or near a shaft or trench with an excavated depth GREATER than 1.5 m, or a tunnel ("deeper than 1.5 m" is correct for this category; the reg 306 support duty applies at 1.5 m)
  • §reg 304: obtain information about underground essential services before excavating (Before You Dig Australia, formerly Dial Before You Dig), have it available on site, and confirm it by locating and hand potholing
  • §reg 305: manage the risks of any excavation work under Part 3.1, including a person falling into the excavation, being trapped by its collapse, being struck by a falling thing or exposed to an airborne contaminant, having regard to the nature of the excavation, the work method and the means of entry and exit. Barricading or isolating the area around an excavation shallower than 1.5 m is a control under this duty (with reg 36), never under reg 306
  • §reg 166: no person, plant or thing may come within an unsafe distance of an overhead or underground electric line; where that is not reasonably practicable a risk assessment and control measures are required
  • §reg 81 and Schedule 3: high risk work licences where cranes or specific plant classes are used
  • §reg 44 to reg 47: PPE duties (high-visibility clothing near plant)

What's inside

  • ✓ Title block: PCBU, principal contractor, site address, prepared and review dates
  • ✓ High risk construction work categories identified for your activity
  • ✓ Step-by-step work method with hazards, risk ratings, and controls
  • ✓ Controls in hierarchy order: eliminate, substitute, isolate, engineer, administer, PPE
  • ✓ Plant, equipment, permits, licences, and training requirements
  • ✓ Emergency procedures and review triggers
  • ✓ Your state’s legislation cited (WHS Regulation, or OHS Regulations in Victoria)
  • ✓ Worker consultation and sign-off block

What a safe work method statement costs everywhere else

Same document, three very different price tags and wait times.

Safety consultantTemplate shopsSWMS Pack
PriceA$250 to A$1500A$19 to A$88 per templateA$39, packs from A$179
Turnaround3 to 10 dayshours of DIY editing~4 minutes
Site-specific to this jobYesNo, you fill in blanksYes
State-correct citationsYesOften generic or staleYes, verified against 80+ WHS citations
Victoria handled correctlyYesRarelyYes, OHS Regulations branch
Revisions when the builder asksBilled hourlyYou edit it yourselfFree within 24h

Get yours in minutes

Common questions

▸How fast can I get a safe work method statement?

About 4 minutes after the 10-minute questionnaire. It downloads instantly and a copy lands in your email.

▸Does it cover the WHS requirements for excavation / earthmoving work?

Yes. Excavation / Earthmoving documents are generated against a curated WHS focus list for the trade, and every regulation and Australian Standard citation is validated against a verified citations table before delivery. Victorian orders are written to the OHS Regulations 2017 instead.

▸What if the builder or principal contractor asks for changes?

Reply to your delivery email and we revise the document free within 24 hours.

Excavation / Earthmoving SWMS by state

Your SWMS is written to your state's legislation. Victoria uses its own OHS Regulations; the other states and territories follow the harmonised WHS laws.

Excavation / Earthmoving SWMS NSWExcavation / Earthmoving SWMS VICExcavation / Earthmoving SWMS QLDExcavation / Earthmoving SWMS WAExcavation / Earthmoving SWMS SAExcavation / Earthmoving SWMS TASExcavation / Earthmoving SWMS ACTExcavation / Earthmoving SWMS NT

Safe Work Method Statement for other trades

ElectricianPlumberCarpenterRooferScaffolderConcreterBricklayerPainterTilerDemolitionSolar Installer

Free tools and guides

Free SWMS template (PDF + Word)Working at heights SWMSExcavation SWMSConfined space entry permitSWMS vs JSA: the differenceSWMS requirements by stateThe 18 HRCW categoriesAll WHS documents for excavation / earthmovingsSWMS cost calculator

Other documents

Sample documents