Excavation / Earthmoving SWMS in Queensland
In Queensland, excavation / earthmoving contractors must prepare a Safe Work Method Statement before starting high risk construction work, under WHS Regulation 2011 (Qld) s 299, which requires a SWMS before any high risk construction work. The regulator is Workplace Health and Safety Queensland. For excavation / earthmoving work the SWMS must be site-specific and cover the high risk categories the trade routinely hits: work in or near a shaft or trench deeper than 1.5 m, or a tunnel, work in an area with movement of powered mobile plant, work on, in or adjacent to a road, railway or other traffic corridor in use, work on or near energised electrical installations or services. One SWMS can cover several of those activities. A generic template can be reused for recurring work only if it is reviewed and adapted to each site's hazards first; an unreviewed copy does not meet the requirement.
The SWMS law in Queensland
Excavation / Earthmoving work in Queensland is regulated by Workplace Health and Safety Queensland under the Work Health and Safety Act 2011 (Qld) and the Work Health and Safety Regulation 2011 (Qld). The duty to prepare a SWMS before high risk construction work is set by WHS Regulation 2011 (Qld) s 299, and the high risk construction work itself is defined in WHS Regulation 2011 (Qld) s 291. These follow the harmonised model WHS laws, so a SWMS prepared for another harmonised state transfers with a site-specific review.
Electrical work in Queensland is regulated separately under the Electrical Safety Act 2002 (Qld) and Electrical Safety Regulation 2013, which sit alongside the WHS Regulation, so electrical SWMS on Queensland sites should account for both regimes.
Queensland was the first state to enact an industrial manslaughter offence (2017, s 34C WHS Act 2011 (Qld)) and recorded Australia's first conviction in 2020. A site-specific SWMS is part of how a excavation / earthmoving business shows it identified and controlled the high risk work these duties attach to, rather than relying on a generic template.
High risk work for excavation / earthmoving crews
The high risk construction work categories a excavation / earthmoving SWMS usually has to cover:
- ✓ Work in or near a shaft or trench deeper than 1.5 m, or a tunnel
- ✓ Work in an area with movement of powered mobile plant
- ✓ Work on, in or adjacent to a road, railway or other traffic corridor in use
- ✓ Work on or near energised electrical installations or services
Typical excavation / earthmoving activities that each need their own SWMS:
- · Trench excavation deeper than 1.5 m with shoring or benching
- · Bulk excavation with excavator and truck movements
- · Excavation near underground services (locate and pothole)
- · Working near overhead powerlines
- · Excavation adjacent to roads and traffic corridors
- · Footing, pier and shaft excavation
Hazards a excavation / earthmoving SWMS has to control
The hazards that recur on excavation / earthmoving jobs and that a site-specific SWMS is expected to address:
- ⚠ Trench and excavation collapse
- ⚠ Underground service strikes
- ⚠ Overhead powerlines
- ⚠ Powered mobile plant near workers on foot
- ⚠ Traffic on adjacent roads
- ⚠ Water ingress
The rules a excavation / earthmoving SWMS is written against
Beyond the general duty in WHS Regulation 2011 (Qld) s 299, a excavation / earthmoving SWMS in Queensland is written against the specific model WHS duties and standards that apply to the trade's activities:
- § reg 306: before excavating a trench at least 1.5 m deep, secure the work area from unauthorised access and support all sides by shoring, benching or battering, unless a geotechnical engineer advises in writing that the sides are safe from collapse. The duty applies to a trench 1.5 m deep or deeper. It sets no inspection frequency, so trench inspection is written as good practice without this citation. Securing the area around a shallower excavation is NOT this duty (see reg 305)
- § reg 291: high risk construction work includes work in or near a shaft or trench with an excavated depth GREATER than 1.5 m, or a tunnel ("deeper than 1.5 m" is correct for this category; the reg 306 support duty applies at 1.5 m)
- § reg 304: the person with management or control of the workplace must take all reasonable steps to obtain current underground essential services information for the excavation area and adjacent areas before directing or allowing the excavation to start, and must give it to any person it engages to carry out the excavation; that person, and any business given the information, must have regard to it. A contractor that does not manage or control the workplace gets the information from the person with management or control of the workplace (normally the principal contractor) before excavating. Checking Before You Dig Australia (formerly Dial Before You Dig) and confirming services by locating and hand potholing are good practice, not part of this duty
- § reg 305: manage the risks of any excavation work under Part 3.1, including a person falling into the excavation, being trapped by its collapse, being struck by a falling thing or exposed to an airborne contaminant, having regard to the nature of the excavation, the work method and the means of entry and exit. Barricading or isolating the area around an excavation shallower than 1.5 m is a control under this duty (with reg 36), never under reg 306
- § reg 166: no person, plant or thing may come within an unsafe distance of an overhead or underground electric line; where that is not reasonably practicable a risk assessment and control measures are required
- § reg 81 and Schedule 3: high risk work licences where cranes or specific plant classes are used
- § reg 44 to reg 47: PPE duties (high-visibility clothing near plant)
What Queensland builders check before you start
A principal contractor in Queensland collects your SWMS before your crew goes on site and checks four things: that it is site-specific to this job (not a reused template), that every high risk category for excavation / earthmoving work is covered and controlled, that controls follow the hierarchy rather than jumping to PPE, and that it cites Queensland legislation. SWMS Pack writes to all four: your site details throughout, WHS Regulation 2011 (Qld) s 299 cited, and an adversarial review pass before delivery.
Common questions
▸Do excavation / earthmoving contractors need a SWMS in Queensland?
Yes, whenever the work involves any high risk construction work, which for excavation / earthmoving work it usually does (work in or near a shaft or trench deeper than 1.5 m, or a tunnel and work in an area with movement of powered mobile plant). The duty to prepare it sits with the PCBU carrying out the work, under WHS Regulation 2011 (Qld) s 299.
▸Which law covers SWMS in Queensland?
The Work Health and Safety Act 2011 (Qld) and the Work Health and Safety Regulation 2011 (Qld), enforced by Workplace Health and Safety Queensland. These follow the harmonised model WHS laws used in most states.
▸How fast can I get a excavation / earthmoving SWMS for a Queensland site?
About 5 minutes of questions, then the document is generated and verified in a few minutes and downloads straight away, written to Queensland legislation and to your specific site.
Writing it yourself? Start from the SWMS template QLD guide for the Queensland rules.
Excavation / Earthmoving SWMS in other states
New South WalesVictoriaWestern AustraliaSouth AustraliaTasmaniaAustralian Capital TerritoryNorthern Territory
Other trades in Queensland
ElectricianPlumberCarpenterRooferScaffolderConcreterBricklayerPainterTilerDemolitionSolar Installer