Excavation / Earthmoving SWMS in Tasmania
In Tasmania, excavation / earthmoving contractors must prepare a Safe Work Method Statement before starting high risk construction work, under WHS Regulations 2022 (Tas) reg 299, which requires a SWMS before any high risk construction work. The regulator is WorkSafe Tasmania. For excavation / earthmoving work the SWMS must be site-specific and cover the high risk categories the trade routinely hits: work in or near a shaft or trench deeper than 1.5 m, or a tunnel, work in an area with movement of powered mobile plant, work on, in or adjacent to a road, railway or other traffic corridor in use, work on or near energised electrical installations or services. One SWMS can cover several of those activities. A generic template can be reused for recurring work only if it is reviewed and adapted to each site's hazards first; an unreviewed copy does not meet the requirement.
The SWMS law in Tasmania
Excavation / Earthmoving work in Tasmania is regulated by WorkSafe Tasmania under the Work Health and Safety Act 2012 (Tas) and the Work Health and Safety Regulations 2022 (Tas). The duty to prepare a SWMS before high risk construction work is set by WHS Regulations 2022 (Tas) reg 299, and the high risk construction work itself is defined in WHS Regulations 2022 (Tas) reg 291. These follow the harmonised model WHS laws, so a SWMS prepared for another harmonised state transfers with a site-specific review.
Tasmania remade its regulations as the WHS Regulations 2022, replacing the 2012 version, so current SWMS duties are cited to the 2022 Regulations and enforced by WorkSafe Tasmania.
Tasmania's industrial manslaughter offence commenced on 2 October 2024, adding serious criminal penalties where a death at work is caused by the conduct of a PCBU or officer. A site-specific SWMS is part of how a excavation / earthmoving business shows it identified and controlled the high risk work these duties attach to, rather than relying on a generic template.
High risk work for excavation / earthmoving crews
The high risk construction work categories a excavation / earthmoving SWMS usually has to cover:
- ✓ Work in or near a shaft or trench deeper than 1.5 m, or a tunnel
- ✓ Work in an area with movement of powered mobile plant
- ✓ Work on, in or adjacent to a road, railway or other traffic corridor in use
- ✓ Work on or near energised electrical installations or services
Typical excavation / earthmoving activities that each need their own SWMS:
- · Trench excavation deeper than 1.5 m with shoring or benching
- · Bulk excavation with excavator and truck movements
- · Excavation near underground services (locate and pothole)
- · Working near overhead powerlines
- · Excavation adjacent to roads and traffic corridors
- · Footing, pier and shaft excavation
Hazards a excavation / earthmoving SWMS has to control
The hazards that recur on excavation / earthmoving jobs and that a site-specific SWMS is expected to address:
- ⚠ Trench and excavation collapse
- ⚠ Underground service strikes
- ⚠ Overhead powerlines
- ⚠ Powered mobile plant near workers on foot
- ⚠ Traffic on adjacent roads
- ⚠ Water ingress
The rules a excavation / earthmoving SWMS is written against
Beyond the general duty in WHS Regulations 2022 (Tas) reg 299, a excavation / earthmoving SWMS in Tasmania is written against the specific model WHS duties and standards that apply to the trade's activities:
- § reg 304 to reg 306: excavation duties, including support for trenches 1.5 m or deeper (shoring, benching, battering) and geotechnical advice
- § reg 304: obtain information about underground essential services before excavating (Before You Dig Australia, formerly Dial Before You Dig), have it available on site, and confirm it by locating and hand potholing
- § reg 166: no person, plant or thing may come within an unsafe distance of an overhead or underground electric line; where that is not reasonably practicable a risk assessment and control measures are required
- § reg 81 and Schedule 3: high risk work licences where cranes or specific plant classes are used
- § reg 44 to reg 47: PPE duties (high-visibility clothing near plant)
What Tasmania builders check before you start
A principal contractor in Tasmania collects your SWMS before your crew goes on site and checks four things: that it is site-specific to this job (not a reused template), that every high risk category for excavation / earthmoving work is covered and controlled, that controls follow the hierarchy rather than jumping to PPE, and that it cites Tasmania legislation. SWMS Pack writes to all four: your site details throughout, WHS Regulations 2022 (Tas) reg 299 cited, and an adversarial review pass before delivery.
Common questions
▸Do excavation / earthmoving contractors need a SWMS in Tasmania?
Yes, whenever the work involves any high risk construction work, which for excavation / earthmoving work it usually does (work in or near a shaft or trench deeper than 1.5 m, or a tunnel and work in an area with movement of powered mobile plant). The duty to prepare it sits with the PCBU carrying out the work, under WHS Regulations 2022 (Tas) reg 299.
▸Which law covers SWMS in Tasmania?
The Work Health and Safety Act 2012 (Tas) and the Work Health and Safety Regulations 2022 (Tas), enforced by WorkSafe Tasmania. These follow the harmonised model WHS laws used in most states.
▸How fast can I get a excavation / earthmoving SWMS for a Tasmania site?
About 5 minutes of questions, then the document is generated and verified in a few minutes and downloads straight away, written to Tasmania legislation and to your specific site.
Excavation / Earthmoving SWMS in other states