SPSWMS Pack

Painting SWMS for Painter Contractors

The site-specific SWMS builders demand before your crew can start. Generated for painter contractors in about 4 minutes, checked against our library of current state WHS citations, A$39 flat.

Trade packs from A$179 · toolbox talk pack (24 talks) +A$24 at checkout

Page 1 of a sample SWMS: switchboard installation for an electrical contractor in NSW
Page 1 of a sample SWMS. See the full sample

When you need this document

A builder or principal contractor is asking for a site-specific SWMS before you can get on the job, or your work falls under a high risk construction work category and the law requires one before work starts.

What it covers for painter work

Typical hazards addressed: falls from ladders and trestles, hazardous substances in paints and solvents, lead paint disturbance on older buildings, spray mist in poorly ventilated areas, repetitive strain and overhead work. Citations from the Painter focus list:

  • §reg 78 and reg 79: manage the risk of ANY fall liable to cause injury from ladders, trestles and EWPs; a fall of more than 2 m is additionally high risk construction work under reg 291
  • §AS/NZS 1892: portable ladders
  • §reg 44 to reg 47: PPE duties (RPE for spraying, eye protection)
  • §reg 36: hierarchy of controls for hazardous paint components and lead-based paint on pre-1970 buildings
  • §Asbestos and painting work: the asbestos demolition and refurbishment lines that follow apply to painting work only where the job is refurbishment that disturbs the structure itself (for example sanding, scraping, water blasting or drilling walls, ceilings, eaves, cladding or roof sheeting, or removing linings) in an older building, structure or plant that the application line covers (built or installed before the date it gives). Minor or routine maintenance work, and other minor work, is excluded. On a job that does not disturb the structure in such a building, do not state these duties as applying
  • §reg 447: the asbestos duties for demolition and refurbishment (reg 448 to reg 457) apply to the demolition or refurbishment of a structure or plant constructed or installed before 31 December 2003. Demolition or refurbishment does not include minor or routine maintenance work, or other minor work. Where these duties apply they are law, never good practice
  • §reg 448 to reg 450: before demolition or refurbishment starts, the person with management or control of the workplace must ensure the asbestos register is reviewed (and revised if it is inadequate for the proposed work) and that the business carrying out the work is given a copy, and the business carrying out the demolition or refurbishment must obtain a copy of the asbestos register from the person with management or control of the workplace before it starts the work
  • §reg 451: where there is no asbestos register for the structure or plant, the business that is to carry out the demolition or refurbishment must not carry it out until the structure or plant has been inspected to determine whether asbestos or ACM is fixed to or installed in it, and must ensure that the determination is undertaken by a competent person. It must assume that asbestos or ACM is fixed to or installed in the structure or plant if the competent person is, on reasonable grounds, uncertain, or if part of the structure or plant is inaccessible and likely to be disturbed. If asbestos or ACM is determined or assumed to be present, it must inform the occupier and the owner of the premises (residential premises) or, in any other case, the person with management or control of the workplace
  • §reg 456 and reg 457: all asbestos that is likely to be disturbed by the refurbishment must be identified and, so far as is reasonably practicable, removed before the refurbishment is commenced. For residential premises this is the duty of the business carrying out the refurbishment (reg 457); for any other workplace it is the duty of the person with management or control of the workplace, or of the structure or plant (reg 456)

What's inside

  • ✓ Title block: PCBU, principal contractor, site address, prepared and review dates
  • ✓ High risk construction work categories identified for your activity
  • ✓ Step-by-step work method with hazards, risk ratings, and controls
  • ✓ Controls in hierarchy order: eliminate, substitute, isolate, engineer, administer, PPE
  • ✓ Plant, equipment, permits, licences, and training requirements
  • ✓ Emergency procedures and review triggers
  • ✓ Your state’s legislation cited (WHS Regulation, or OHS Regulations in Victoria)
  • ✓ Worker consultation and sign-off block

What a safe work method statement costs everywhere else

Same document, three very different price tags and wait times.

Safety consultantTemplate shopsSWMS Pack
PriceA$250 to A$1500A$19 to A$88 per templateA$39, packs from A$179
Turnaround3 to 10 dayshours of DIY editing~4 minutes
Site-specific to this jobYesNo, you fill in blanksYes
State-correct citationsYesOften generic or staleYes, verified against 80+ WHS citations
Victoria handled correctlyYesRarelyYes, OHS Regulations branch
Revisions when the builder asksBilled hourlyYou edit it yourselfFree within 24h

Get yours in minutes

Common questions

▸How fast can I get a safe work method statement?

About 4 minutes after the 10-minute questionnaire. It downloads instantly and a copy lands in your email.

▸Does it cover the WHS requirements for painter work?

Yes. Painter documents are generated against a curated WHS focus list for the trade, and every regulation and Australian Standard citation is validated against a verified citations table before delivery. Victorian orders are written to the OHS Regulations 2017 instead.

▸What if the builder or principal contractor asks for changes?

Reply to your delivery email and we revise the document free within 24 hours.

Painter SWMS by state

Your SWMS is written to your state's legislation. Victoria uses its own OHS Regulations; the other states and territories follow the harmonised WHS laws.

Painter SWMS NSWPainter SWMS VICPainter SWMS QLDPainter SWMS WAPainter SWMS SAPainter SWMS TASPainter SWMS ACTPainter SWMS NT

Safe Work Method Statement for other trades

ElectricianPlumberCarpenterRooferScaffolderConcreterBricklayerTilerDemolitionExcavation / EarthmovingSolar Installer

Free tools and guides

Free SWMS template (PDF + Word)Working at heights SWMSExcavation SWMSConfined space entry permitSWMS vs JSA: the differenceSWMS requirements by stateThe 18 HRCW categoriesAll WHS documents for paintersSWMS cost calculator

Other documents

Sample documents