Safe Work Method Statement for Solar Installer Contractors
The site-specific SWMS builders demand before your crew can start. Generated for solar installer contractors in about 4 minutes, checked against our library of current state WHS citations, A$39 flat.
Trade packs from A$179 · 52-week toolbox talk pack +A$29 at checkout
When you need this document
A builder or principal contractor is asking for a site-specific SWMS before you can get on the job, or your work falls under a high risk construction work category and the law requires one before work starts.
What it covers for solar installer work
Typical hazards addressed: falls from roofs, dc electrical shock from energised strings, fragile roof surfaces, manual handling of panels on ladders, heat exposure, battery storage hazards. Citations from the Solar Installer focus list:
- §reg 78 and reg 79: managing the risk of falls: all rooftop solar work above 2 m
- §reg 157 and reg 158: energised electrical work restrictions (DC strings cannot be fully isolated in daylight)
- §AS/NZS 3000: electrical installations (wiring rules)
- §AS/NZS 1891: industrial fall-arrest systems
- §reg 44 to reg 47: PPE duties
What's inside
- ✓ Title block: PCBU, principal contractor, site address, prepared and review dates
- ✓ High risk construction work categories identified for your activity
- ✓ Step-by-step work method with hazards, risk ratings, and controls
- ✓ Controls in hierarchy order: eliminate, substitute, isolate, engineer, administer, PPE
- ✓ Plant, equipment, permits, licences, and training requirements
- ✓ Emergency procedures and review triggers
- ✓ Your state’s legislation cited (WHS Regulation, or OHS Regulations in Victoria)
- ✓ Worker consultation and sign-off block
What a safe work method statement costs everywhere else
Same document, three very different price tags and wait times.
| Safety consultant | Template shops | SWMS Pack | |
|---|---|---|---|
| Price | A$250 to A$1500 | A$19 to A$88 per template | A$39, packs from A$179 |
| Turnaround | 3 to 10 days | hours of DIY editing | ~4 minutes |
| Site-specific to this job | Yes | No, you fill in blanks | Yes |
| State-correct citations | Yes | Often generic or stale | Yes, verified against 80+ WHS citations |
| Victoria handled correctly | Yes | Rarely | Yes, OHS Regulations branch |
| Revisions when the builder asks | Billed hourly | You edit it yourself | Free within 24h |
Common questions
▸How fast can I get a safe work method statement?
About 4 minutes after the 10-minute questionnaire. It downloads instantly and a copy lands in your email.
▸Does it cover the WHS requirements for solar installer work?
Yes. Solar Installer documents are generated against a curated WHS focus list for the trade, and every regulation and Australian Standard citation is validated against a verified citations table before delivery. Victorian orders are written to the OHS Regulations 2017 instead.
▸What if the builder or principal contractor asks for changes?
Reply to your delivery email and we revise the document free within 24 hours.
Solar Installer SWMS by state
Your SWMS is written to your state's legislation. Victoria uses its own OHS Regulations; the other states and territories follow the harmonised WHS laws.
Solar Installer SWMS NSWSolar Installer SWMS VICSolar Installer SWMS QLDSolar Installer SWMS WASolar Installer SWMS SASolar Installer SWMS TASSolar Installer SWMS ACTSolar Installer SWMS NT
Safe Work Method Statement for other trades
ElectricianPlumberCarpenterRooferScaffolderConcreterBricklayerPainterTilerDemolitionExcavation / Earthmoving
Free tools and guides
Free SWMS template (PDF + Word)Working at heights SWMSExcavation SWMSConfined space entry permitSWMS vs JSA: the differenceSWMS requirements by stateThe 18 HRCW categoriesAll WHS documents for solar installersSWMS cost calculator